Grade Beams Poured

It took 5 hours to pour the 10" wide x 24" tall concrete beams. 

The bolts on top of the concrete are used to fasten the future steel columns.


Vertical rebar is used to set the masonry surrounding the gym.

The horizontal rebar is for the concrete pad on the outside of the building.